APPLICATION 3

Thermo cycling system
combining inline heating/cooling
system with hot test system

PROCESS SEQUENCE

·
Feed product to heating oven
·
heat product to required
temperature
·
Hold product at required
temperature for a required
time
·
Feed heated product to test
handler
·
Read barcode
·
Locate product in test position
·
Engage test fixture to product
·
Testoperation
·
Release product from test
fixture
·
Move good products to
cooling zone
·
Cool down products to 40°C
·
Move failed products to
reject area (conveyor)

MFM-150

Modular production line with

integrated hot test system (in-line or off-line)